Bunn TITAN DUAL 401190000G User Manual

TITAN DUAL™  
INSTALLATION & OPERATING GUIDE  
BUNN-O-MATIC CORPORATION  
POST OFFICE BOX 3227  
SPRINGFIELD, ILLINOIS 62708-3227  
PHONE: (217) 529-6601 FAX: (217) 529-6644  
To ensure you have the latest revision of the manual or to obtain the illustrated parts catalog, please  
to obtain the latest catalog and manual updates. Contact Bunn-O-Matic Corporation at 1-800-286-  
6070 to obtain a paper copy of the required Illustrated Parts Catalog mailed via U.S. Postal Service.  
40119.0000G 5/12 ©2007 Bunn-O-Matic Corporation  
USER NOTICES  
Carefully read and follow all notices in this manual and on the equipment. All labels on the equipment should be  
kept in good condition. Replace any unreadable or damaged labels.  
WARNING  
HAZARDOUS  
VOLTAGE  
DISCONNECT FROM  
POWER SOURCE  
BEFORE REMOVING!  
12559.0003  
#00986.0000  
Optional Field Wiring  
#00658.0000  
120/208 V, 40.1 A, 8200 W  
1PH, 3-Wire + GND, 50/60HZ  
29710.0015  
#37881.0000  
Optional Field Wiring  
As directed in the International Plumbing Code of the  
International Code Council and the Food Code  
120/240 V, 35.0 A, 8200 W  
1PH, 3-Wire + GND, 60HZ  
Manual of the Food and Drug Administration (FDA),  
this equipment must be installed with adequate  
backflow prevention to comply with federal, state  
and local codes. For models installed outside the  
U.S.A., you must comply with the applicable Plumb-  
ing /Sanitation Code for your area.  
#00656.0001  
29710.0019  
MAIN ON/OFF  
SWITCH  
Optional Field Wiring  
230 V, 32.8 A, 7550 W  
1PH, 2-Wire + GND, 50/60HZ  
00824.0002  
39803.0000  
29710.0020  
03408.0004  
00824.0001  
03409.0004  
40119 010412  
Page 3  
ELECTRICAL REQUIREMENTS  
WARNING - If the power cord is ever damaged, it must be replaced by the manufacturer or its service agent with  
a special cord available from the manufacturer or its service agent in order to avoid a hazard.  
Refer to Data Plate on the Brewer, and local/national electrical codes to determine circuit requirements.  
TO MACHINE  
WHI  
BLU  
RED  
BLK  
WHI  
BLU  
RED  
BLK  
N
N
L1  
L2  
L3  
N
L3  
L3  
L2  
L1  
L2  
L1  
FROM POWER SOURCE  
FOR SINGLE PHASE OPERATION  
MOVE BLU WIRE INTO TERMINAL  
BLOCK WITH BLACK WIRE.  
CONNECT INPUT WIRING TO:  
L1, L2 & N FOR 120/208V &  
120/240V MODELS,  
GREEN  
GREEN  
GREEN  
GREEN  
L1 & N for 230V MODELS.  
400/230V volt ac three phase,  
50/60 Hz models  
120/208 and 120/240 volt ac  
three phase, 50/60 Hz models  
Note: This electrical service consists of 4 cur-  
rent carrying conductors (Neutral, L1, L2 and  
L3) and a separate conductor for earth ground.  
Note: This electrical service consists of 4 cur-  
rent carrying conductors (Neutral, L1, L2 and  
L3) and a separate conductor for earth ground.  
SYSTEM  
VOLTAGE  
208  
SYSTEM  
VOLTAGE  
400  
V1  
208  
240  
V2  
120  
120  
V1  
400  
V2  
230  
230  
240  
230  
L1, L2, L3, are the 3 phases  
V1 = Phase to phase voltage, between any 2 phases.  
V2 = Phase to neutral voltage, L1 to neutral must be 230V.  
L1, L2, L3, are the 3 phases  
V1 = Phase to phase voltage, between any 2 phases.  
V2 = Phase to neutral voltage, L1 to neutral must be 120V.  
ELECTRICAL HOOK-UP  
CAUTION – Improper electrical installation will damage electronic components. Damage caused by incorrect  
electrical connections is not covered by warranty.  
1. An electrician must provide electrical service as specified in conformance with all local, state and federal  
electrical codes.  
2. Using a voltmeter, check the voltage and color coding of each conductor at the electrical source.  
NOTE - The brewer is shipped without a plug on the power cord. Qualified service personnel must select  
and install the proper UL listed grounding type attachment plug specified on the rear of the brewer.  
3. Install the specified plug on the attached power cord.  
4. Remove the front access panel to gain access to the terminal block.  
5. Connect the brewer to the power source and verify the voltage at the terminal block before proceeding.  
6. If plumbing is to be hooked up later be sure the brewer is disconnected from the power source. If plumbing  
has been hooked up, the brewer is ready for Initial Set-Up.  
40119 080108  
Page 4  
CE REQUIREMENTS  
• This appliance must be installed in locations where it can be overseen by trained personnel.  
• For proper operation, this appliance must be installed where the temperature is between 5°C to 35°C.  
• Appliance shall not be tilted more than 10° for safe operation.  
• An electrician must provide electrical service as specified in conformance with all local and national codes.  
• This appliance must not be cleaned by water jet.  
• This appliance is not intended for use by persons (including children) with reduced physical, sensory or mental  
capabilities, or lack of experience and knowledge, unless they have been given instructions concerning use of  
this appliance by a person responsible for its safety.  
• Children should be supervised to ensure they do not play with the appliance.  
If the power cord is ever damaged, it must be replaced by the manufacturer or authorized service personnel with  
a special cord available from the manufacturer or its authorized service personnel in order to avoid a hazard.  
PLUMBING REQUIREMENTS  
This brewer must be connected to a cold water system with operating pressure between 20 and 90 psi (138  
and 620 kPa) with a minimum of 4.0 gpm from a 1⁄2" or larger supply line. A shut-off valve should be installed  
in the line before the brewer. Install a regulator in the line when pressure is greater than 90 psi (620 kPa) to  
reduce it to 50 psi (345 kPa). The water inlet fitting is 3⁄8" flare.  
NOTE - Bunn-O-Matic recommends 3⁄8" copper tubing for all installations from the 1⁄2" water supply line. A tight  
coil of copper tubing in the water line will facilitate moving the brewer to clean the counter top. Bunn-O-Matic  
does not recommend the use of a saddle valve to install the brewer. The size and shape of the hole made in the  
supply line by this type of device may restrict water flow.  
As directed in the International Plumbing Code of the International Code Council and the Food Code  
Manual of the Food and Drug Administration (FDA), this equipment must be installed with adequate  
backflow prevention to comply with federal, state and local codes. For models installed outside the  
U.S.A., you must comply with the applicable Plumbing /Sanitation Code for your area.  
PLUMBING HOOK UP  
NOTE - If a backflow preventer is required by code, a shock arrestor should be installed between  
backflow preventer and dispenser. Installing the shock arrestor as close to dispenser as possible  
will provide best results.  
1. Remove the shipping cap from the fitting on the bottom of the brewer.  
2. Attach the flare tube assembly (supplied separately with the brewer) to the fitting using the  
copper flare gaskets on each end as shown in illustration.  
3. Flush the water line and securely attach it to the flare elbow fitting.  
P4290  
4. Turn on the water supply.  
TANK DRAIN  
1. Remove screws that secure the front access panel. Remove the panel.  
2. Unfasten the hose clamp at the end of the drain hose. Remove the plug.  
3. Place the end of the drain hose in a drain or a container that has a minimum capacity of 16.0 gallons (60.5  
liters).  
4. Release the white clamp to drain water from the tank.  
5. When tank is empty, close the white clamp, replace the plug, and tighten the clamp at the end of the drain  
hose.  
6. Replace the front panel and tighten screws.  
40119 010412  
Page 5  
OPERATING CONTROLS  
B
B
C
G
E
ENABLE  
ON / OFF  
BREW  
ENABLE  
READY TO BREW  
WATER TEMP: 200°  
ON / OFF  
BREW  
LARGE  
SMALL  
LARGE  
SMALL  
BREW  
BREW  
F
F
D
H
D
A. MAIN ON/OFF SWITCH  
This switch, located under the brewer in front of the right rear leg, turns  
power on and off to all components in the brewer.  
B. ON/OFF SWITCH (ENABLE BREW)  
Pressing the "ON/OFF" switch will alternately turn the selected brewing side  
on and off. Pressing this switch during the brew cycle will interrupt the brew  
cycle, stopping the flow of water. Pressing this switch during programming of  
the brewer will exit the setup and return to the main screen.  
P3894  
C. PROGRAMMING (left)  
This hidden switch can be used to scroll backwards through the function list while in programming mode.  
D. BREW  
When the ON/OFF switch is ON and the main screen is visible, momentarily pressing and releasing this  
button will begin a brew cycle on the selected side.  
E. PROGRAMMING (right)  
Pressing and holding this switch allows entry into the programming menus. Pressing and releasing the switch  
steps through each function screen while in the programming mode.  
F. BATCH SELECTOR SWITCHES  
Pressing the switch corresponding to the Half or Full batch selects the amount of product to be brewed on  
the selected side. Pressing a different switch after a brew cycle has been initiated does not change the brew  
batch in progress. Light indicates the selected batch to brew. Also used in programming to adjust settings on  
both batch sizes.  
G. FUNCTION SCREEN  
This is the display which shows the various functions of the brewer and allows the programming to be ac-  
complished.  
H. FUNCTION SCREEN SWITCHES  
These are hidden switches which are used to program the brewer when in the programming mode.  
40119 080108  
Page 6  
INITIAL SET-UP  
CAUTION – The brewer must be disconnected from the power  
source throughout the initial setup, except when specified  
in the instructions.  
1. Insert an empty funnel into the funnel rails of one of the  
brew stations.  
2. Place an empty server under the funnel.  
3. Connect the brewer to the power source. Make sure the  
corresponding ON/OFF switch is ON (LED will be lit).  
4. Water will flow into the tank and stop when the tank is filled  
to its capacity. Display will show PLEASE WAIT...TANK  
FILLING until tank is filled with water.  
5. Wait approximately twenty-five minutes for the water in the  
tank to heat to the proper temperature. Display will show  
READY TO BREW...WATER TEMP: 205° when tank is at  
operating temperature. Some water may drip from the fun-  
nels during this time; this is due to expansion and should  
not occur thereafter.  
NOTE:Brewwatertemperatureisfactorysetat205°F(96.1°  
C). Refer to TEMPERATURE SELECTION below should the  
watertemperatureneedtobeincreasedordecreased.When  
brew water temperature is changed, ready temperature will  
need to be increased or decreased also.  
6. Place a small vessel beneath the faucet and open the faucet  
handle. Release it when you hear the tank refilling.  
7. Water volumes and flow settings have been preset at the factory. Refer to adjustments for the Set Brew  
com should the volume need to be increased or decreased.  
8. The brewer is now ready for use in accordance with the instructions for Coffee Brewing.  
TEMPERATURE SELECTION  
SET TEMP - Range: 185˚F (85˚C) to 205˚F (96˚C)  
This function allows the operator to set the brew water temperature in the tank. It also sets the hot water  
faucet dispense temperature.  
SET TEMP: XXX°  
(-)  
DONE  
(+)  
Procedure for setting the Set Temp:  
1. Press and hold the right hidden switch until the display reads SET LANGUAGE. Press and release the right  
hidden switch until the display reads SET TEMP: XXX°.  
2. Using (-) and (+), adjust the brew and faucet temperature.  
3. When finished, press DONE to save the new setting and to advance to the next function screen, READY  
TEMP: XXX°. Press and release the ON/OFF switch (either on DUAL brewers) to exit programming and return  
to the MAIN SCREEN.  
440119 010412  
Page 7  
TEMPERATURE SELECTION (cont.)  
READY TEMP - Range: 2° to 20° F (2° to 10° C)  
This function allows the operator to set the minimum temperature allowable to start a brew cycle. The range can  
be from 2° to 20° F within the set temperature. The water must be at the READY temperature or higher for the  
display to indicate READY TO BREW. If brew lockout is enabled, the brewing process will not start below this  
READY temperature.  
READY TEMP: XXX°  
(-)  
DONE  
(+)  
Procedure to set ready temperature:  
1. Press and hold the right hidden switch until display reads SET LANGUAGE. Press and release the right hid-  
den switch until display reads READY TEMP: XXX°.  
2. Using (-) and (+), adjust the ready temperature.  
3. When finished, press DONE to save the new setting and to advance to the next function screen, BREW SET-  
TINGS ?. Press and release the ON/OFF switch (either on DUAL brewers) to exit programming and return to  
the MAIN SCREEN.  
COFFEE BREWING  
Fold over top  
1. Begin each brew cycle with a clean empty brew funnel.  
edge of filter  
2. Insert a BUNN filter into the funnel.  
NOTE: The funnels are equipped with 4 wire loops that can be folded  
over top edge of filter if desired, to prevent filter from folding in  
during the brew cycle.  
3. Pour the fresh coffee into the filter and level the bed of grounds by  
gently shaking.  
4. Slide the funnel into the funnel rails of the selected side until it  
stops.  
5. Place an empty server under the funnel.  
6. The ON/OFF (Enable Brew) switch for the selected side must be ON.  
Select the desired batch size.  
7. Momentarily press and release the BREW button. There may be  
certain situations in which the brew cycle will not begin when BREW is pressed:  
a. SWITCH NOT ON - ON/OFF must be ON.  
b. BREW TEMPERATURE TOO LOW - wait until heated or cancel BREW LOCKOUT option.  
c. CHECK FUNNEL - remove funnel, empty previously brewed grounds and replace with fresh.  
d. DISABLED - select different brew button or batch size.  
8. If none of the above messages are displayed, the display will read NOW BREWING and show the time remain-  
ing in the brew cycle.  
9. Following the brew will be a countdown of drip time DRIPPING which shows the time remaining until the  
coffee no longer drips from the funnel tip.  
10. Carefully remove the brew funnel and discard the grounds and filter only after visible dripping stops.  
40119 010412  
Page 8  
CLEANING  
1. The use of a damp cloth rinsed in any mild, nonabrasive, liquid detergent is recommended for cleaning all  
surfaces on Bunn-O-Matic equipment. Do NOT clean this equipment with a water jet device.  
2. Check and clean each sprayhead. The sprayhead holes must always remain open.  
NOTE: Any buildup on the sprayhead may restrict water flow, and impact your coffee brewing. For consis-  
tently great coffee, clean sprayheads weekly. Upon visual inspection it may appear that light passes through  
all holes in the sprayhead plate, but a thin film of residue can pass light and still impede water flow.  
3. Remove sprayhead from brewer. Disassemble by removing the seal.  
4. Use the pointed end of sprayhead cleaning tool to remove any mineral deposits from the sprayhead holes.  
5. Insert the long end of sprayhead cleaning tool into the sprayhead fitting, and rotate several times to remove  
any mineral deposits from the fitting.  
6. Insert the short end of sprayhead cleaning tool into the bypass fittings, and rotate several times to remove  
any mineral deposits from the fitting.  
7. Reassemble sprayhead and reattach. Sprayhead only needs to be hand tightened.  
verify sprayhead flow rate matches programmed flow rate. Brewer may need to be re-calibrated due to lime  
build up. If brewer is cleaned and build up removed, brewer must be re-calibrated to achieve desired volumes.  
VIEWING ASSET & SERIAL NUMBER  
1. To view the asset number of the machine, press and hold the left hidden switch until the display reads:  
ANXXXXXX...ASSET NUMBER. Release the left hidden switch.  
2. After a 5 second delay, the display will read: DTTNXXXXXX. This is the serial number of the machine.  
40119 010412  
Page 9  

Motorola V176 User Manual
Memorex MD6456 User Manual
Kenwood AROMATIKA CM700 User Manual
HP Hewlett Packard ProLiant DL165 User Manual
Hitachi HUS103073FL3800 User Manual
Durabrand CD 855 User Manual
Doro PHONEEASY 345GSM User Manual
Denon DN D9000 User Manual
Curtis ALPHA 1GT User Manual
American Audio MCD 710 User Manual